Importing HCL Workload Automation reports
This topic describes the Tivoli Common Reporting sample, historical and analytical reports available with HCL Workload Automation
About this task
HCL Workload Automation installation media provide the following packages in the reports folder:
The following packages are available for
the distributed environment:
- Historical_Report.zip
- This package contains the following analytical reports:
- Analysis Job Duration Estimation Error
- Analysis Job Duration Standard Deviation
- IWSReportsSamples_for_TCR.zip
- This compressed file contains packages for each supported database, with the following sample reports:
- Job Run History
- Job Run Statistics Chart
- Job Run Statistics Table
- Auditing_Report.zip
- This compressed file contains packages for each supported database, with the following report:
- Audit Reporting
The following packages are available for the z/OS® environment:
To import HCL Workload Automation packages in
Tivoli Common Reporting, perform the following steps:- Historical_Report_for_zOS.zip
- This package contains the following analytical reports:
- Analysis Job Duration Estimation Error
- Analysis Job Duration Standard Deviation
- TWSReportsSamples_for_TCR_for_zOS.zip
- This package contains the following report:
- Job Run History
Procedure
Results
The following sample reports are available:
Report Name | Description | Supported environment | Available in package |
---|---|---|---|
Job Run History | A report collecting the historical job run data during a specified time interval. It is useful to detect which jobs ended in error or were late, as well as critical and promoted jobs and the latest time within which the job can start without causing the critical job miss its deadline. It also shows which jobs missed their deadline, long duration jobs, and rerun indicators for reruns. | Distributed and z/OS |
|
Job Run Statistics Chart | A report collecting the job run statistics, which returns output in chart format. It is useful to detect success, error rates; minimum, maximum, and average duration; late and long duration statistics; however, it might take some time to generate. | Distributed | IWSReportsSamples _for_TCR.zip |
Job Run Statistics Table | A report collecting the job run statistics, which returns output in table format. It is useful to detect success, error rates; minimum, maximum, and average duration; late and long duration statistics. | Distributed | IWSReportsSamples _for_TCR.zip |
The following analytical reports are available:
Report Name | Description | Supported environment | Available in package |
---|---|---|---|
Analysis Job Duration Estimation Error | A report that shows the average estimation error. It is useful to detect
whether a job ends in frequent errors, ends in error, or if the jobs have unsatisfactory accuracy
rates. You can then drill down to display all the jobs that are in that threshold and finally you
can visualize charts that will help you to identify the jobs that have a high estimated error rate
allowing you to intervene beforehand on those jobs. Note: When
specifying the filter criteria for the Thresholds of this report, consider that the "Correct
interval" threshold cannot be higher than the "Wrong interval".
|
Distributed and z/OS |
|
Analysis Job Duration Standard Deviation | A report showing variances in job duration. The variance is calculated as a percentage and according to which variance level the jobs are they will be presented as follows: High variability, Medium variability or a Low variability. You can drill down to display all the jobs that are in that threshold which then returns output in a chart format. This report is useful to identify the run that had a greater duration. | Distributed and z/OS |
|
Note: To be included in the analytical report, jobs must have a planned duration higher than 0 and
have ran successfully
The following auditing report is available:
Report Name | Description | Supported environment | Available in package |
---|---|---|---|
Audit Reporting | A report that provides an audit trail, consisting of detailed information about the user who performed the change, the time and date when the change was performed, the reason why the change was implemented, and the details of the change for every modified item. | Distributed | Auditing_Report.zip |
You can now use IBM Cognos to create and customize reports on the HCL Workload Automation database. For more information, see the IBM Cognos documentation.