Running the scheduling scenarios
After creating the plan in Scenario 1, the other scenarios use the tutorial objects in the database by scheduling them in the plan. Each scenario explains different scheduling concepts. For each command used in the scenarios, the output is displayed on the screen.
Note: You can run the scenarios in any order because
each scenario uses different objects. However, if you want to run
the same scenario more than once in your sequence, you must reset
the plan and run Scenario 1 again before you rerun the individual
scenario. Perform these steps:
- Run the following command:
ResetPlan -scratch
- Run the scenario1.0.bat in Windows or the scenario1.0.sh script in UNIX.